CV13 & CV16 Conveyor Upgrade Project

Completed the full engineering, supply, installation, and commissioning of a new feeding area integrated with CV13 at Ma’aden Phosphate (Jalamid), increasing capacity from 700 T/h to 1000 T/h with key upgrades to CV13 and CV16 systems.

  • Home
  • Project
  • CV13 & CV16 – Ma’aden Phosphate (Jalamid)

project details

Client: Ma'aden Phosphate Company
Sectors: Mining
PO# 5022404379
Location Jalamid Project – Material Feeding Area (Integrated with CV13 Conveyor)

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.DOC
5000KB

Let’s Start Work
Together

Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.

CV13 & CV16 Project (Ma’aden Phosphate)

PROJECT DESCRIPTION

Project Scope

Project Overview

This project involved the complete delivery of a new material feeding area integrated with the existing CV13 conveyor system at Ma’aden Phosphate Company’s Jalamid Project. The upgrade increased the material handling capacity from 700 T/h to 1000 T/h through the addition of new feeding and conveying equipment, along with major upgrades to the existing CV13 and CV16 systems.


Scope of Work

  • Engineering and design

  • Supply and fabrication

  • Installation and integration

  • Testing and commissioning


Key System Additions

  • Feeding hopper

  • Weigh feeder

  • BCV01 inclined conveyor with steel structure

  • Vibrating screen and chute arrangement

  • FPBCV01 and RBCV01 conveyors

  • Moisture analyzer, belt scale, and new bag filter


Upgrades to Existing Systems

  • Upgrade of CV13 and CV16 motors, gearboxes, and drums

  • Upgrade of silo filter (bag filter)

  • Design, fabrication, installation, and integration of all required steel structures


Capacity Improvement

✅ Increased material handling capacity from 700 T/h to 1000 T/h