Sa'ad Solar PV IPP - 350 MW - KSA
PROJECT DESCRIPTION
Project Scope
- Land leveling works, internal and bypass roads, the length of the road is 70 thousand linear metres
- Land leveling work: 5,800,000 square meters, internal and bypass road leveling, length of the road: 70,000 linear meters
- Security fence works with a length of 10,000 meters and a height of 3 meters, including excavation, backfilling and concrete works, and the supply and installation of the fence according to industrial security specifications.
- Cable tranching work for all sizes of light, medium, and high-tension cables, approximately 90,000 linear meters, including excavation, backfilling, fine red sand, warning tape, and safety requirements.
- Electrical and mechanical works for the station, control rooms, housing, security rooms, entrances and gates, including ventilation, air conditioning, lighting, electricity, alarm and surveillance system, and external lighting
- Rain drainage and road crossing works, the entire project area
At Darkstone Arabia Ltd., we are at the forefront of renewable energy innovation. Our recent project, the Saad Solar PV Independent Power Plant in KSA, boasts a capacity of 350 MW and showcases our expertise in solar power development. From design to implementation, our team ensured the project was executed with precision and efficiency, contributing significantly to sustainable power generation in the Kingdom of Saudi Arabia. Trust Darkstone for cutting-edge renewable energy solutions that drive sustainability and performance.